|
|
|
| Lower bound | Estimate | Upper bound | |
|---|---|---|---|
| Slope | 837.2252 stalled_be_cycles | 877.5371 stalled_be_cycles | 910.9919 stalled_be_cycles |
| Throughput | 0.7056 stalled_be_cycles/byte | 0.6797 stalled_be_cycles/byte | 0.6485 stalled_be_cycles/byte |
| R² | 0.1035338 | 0.1062739 | 0.1043714 |
| Mean | 536.1151 stalled_be_cycles | 611.0742 stalled_be_cycles | 686.4522 stalled_be_cycles |
| Std. Dev. | 363.8105 stalled_be_cycles | 385.4009 stalled_be_cycles | 402.7346 stalled_be_cycles |
| Median | 328.8712 stalled_be_cycles | 392.1201 stalled_be_cycles | 915.7963 stalled_be_cycles |
| MAD | 240.8723 stalled_be_cycles | 581.3572 stalled_be_cycles | 581.3572 stalled_be_cycles |
The plot on the left displays the average time per iteration for this benchmark. The shaded region shows the estimated probabilty of an iteration taking a certain amount of time, while the line shows the mean. Click on the plot for a larger view showing the outliers.
The plot on the right shows the linear regression calculated from the measurements. Each point represents a sample, though here it shows the total time for the sample rather than time per iteration. The line is the line of best fit for these measurements.
See the documentation for more details on the additional statistics.
| Lower bound | Estimate | Upper bound | ||
|---|---|---|---|---|
| Change in time | -99.706% | -99.663% | -99.610% | (p = 0.00 < 0.05) |
| Change in throughput | +33886% | +29554% | +25517% |
The plot on the left shows the probability of the function taking a certain amount of time. The red curve represents the saved measurements from the last time this benchmark was run, while the blue curve shows the measurements from this run. The lines represent the mean time per iteration. Click on the plot for a larger view.
The plot on the right shows the two regressions. Again, the red line represents the previous measurement while the blue line shows the current measurement.
See the documentation for more details on the additional statistics.